 | Six (6) month Trailer Warranty |
|
 | Two Piece Tail Gate for More Strength |
|
 | Tire Warranty in Writing |
|
 | 1" Solid Pin for Gate hinge Is More Reliable |
|
 | Dexter Axles With 1-Year Warranty |
|
 | 2000" Jack With Bottom Foot & Emergency Break Away Kit
Installed |
|
 | Tear Drop Fenders For Added Strength |
|
 | Includes Safety Chains & Tie Down Pockets |
|
 | Flooring is 2" Hemlock Planking |
|
 | Bottom of Trailer is Primed & Painted. Not Left
Unfinished. |
|
 | DOT Approved Lights Are Better Protected |
|
 | Hitch Is Channel Iron Constructed For More Strength Than Angle
Iron |
|
 | All Wiring I Run Through Conduit |
|
 | Tires Weight Rating Is Equal To Or Exceeds Total GVW Rating |
|
 | Trailers Are Primered & Painted With Industrial Coatings |
|
 | Trailers Are Pin Striped For Enhanced Appearance |
|
|
|